PEI, Canada
Actively participating in regular web meetings throughout the project, Sperling Industries played a role in the design and engineering of this PEI plant renovation with both Cavendish and GEM Equipment.
Along with supplying and shipping over 25,000 lbs of steel, Sperling was responsible for providing and executing lift plans for all heavy equipment installations. Our field crews spent approximately one month on the east coast demolishing existing areas and installing new steel and equipment. Even in the midst of the pandemic, we were able to complete the work on time and on budget with no incidences.