Bunge - Original Plant Construction and Ongoing Maintenance

Supply and Install of Structural; Install of Equipment, Fabrication and Install of Vapor Ducting

Altona, Manitoba, Canada

Sperling Industries' turnkey ability to complete multidisciplinary scopes resulted in about 8 months of local work on this new canola oil processing facility. Using the owner's design, shop drawings and files were created for the supply of the extraction building structural steel. Sperling's fabrication shop was also responsible for the production of 4' diameter stainless steel vapor ducting for installation throughout the extraction building. Sperling's field crews installed the structural and the ducting, along with owner-supplied vessels and equipment.

To date, Sperling still provides Bunge with their services on a regular basis. Inclusive quotes are provided to management for ongoing scopes and scheduled shutdowns are organized, and completed, within the allotted time frame using experienced crew members and Sperling-supplied equipment.

 

 


View More

Canada1-877-626-3401     Canada1-800-647-5062     Contact us

Unite Interactive